HV TRANSMISSION · SUBSTATIONS · MV OVERHEAD & RENEWABLE INTERCONNECTION

A schedule built by someone who's also built the estimate.

McMahon Scheduling Group provides Primavera P6 scheduling for high-voltage EPC contractors and utilities — from a scheduler who has also sat on the estimating side, pricing the work he now sequences.

MCMAHON SCHEDULING GROUP LLC — PROJECT TIMELINE ACTIVE
LLC FORMED
APR 2026 · FL
SYSTEMS & BRAND
P6 · M365 · BRAND SET
BID SUPPORT
HV TRANSMISSION & RENEWABLES
NEXT UP
YOUR PROJECT — OPEN

WHY MCMAHON

Most schedulers have never built a cost estimate. That's the gap.

A general contract scheduler can build a clean logic network. Very few spent years pricing HV transmission, substation, and MV overhead work before they ever built a P6 schedule. That background is why the sequencing holds up.

The Estimator (Retired)

Priced the work

  • Retired Lead HV Estimator who priced large transmission line and substation projects
  • Built cost and process proposals using Bid2Win and Excel-based estimating workbooks
  • Fluent in HV scope, crew productivity, and where bids typically hide risk
McMahonEST + SCH
The Scheduler (Full-Time)

Sequencing the work

  • Builds CPM schedules in Primavera P6 Professional for HV EPC and utility projects
  • Translates estimate assumptions directly into activity logic, durations, and sequencing
  • Flags cost-schedule disconnects before they show up as field delays
The market's current options are the large national consulting firms — capable, but expensive and slow to mobilize on a single project — or an in-house scheduler stretched across too many jobs. McMahon Scheduling Group is the option in between: HV-specialized, senior-level scheduling with direct access to the person doing the work, at a fraction of the overhead.

SERVICES

Scheduling support across the life of the project

Every service below is scoped for high-voltage transmission, substation, and utility-scale renewable interconnection work — not adapted from a generic commercial-construction template.

SCH-CPM

CPM Schedule Development

Baseline P6 schedules for HV transmission, substations, and MV overhead line construction — including Hendrix spacer cable systems and bare wire construction — built from real construction logic instead of a recycled activity library.

SCH-BID

Bid & Proposal Schedule Support

Schedule of values, milestone schedules, and P6 submission schedules built to align with your estimate package and survive owner scrutiny.

SCH-UPD

Progress Updates & Reporting

Periodic status updates, progress curves, and schedule narratives that keep the PM, the client, and the field looking at the same picture.

SCH-RSK

Sequencing & Constructability Review

Logic and sequencing risk flagged before it becomes a field problem — long-lead procurement, permit gating, circuit and crew sequencing.

SCH-FOR

Delay & Forensic Analysis

Time impact analysis, as-built reconciliation, and schedule documentation to support delay claims and recovery planning.

SCH-SET

P6 Environment Setup

EPS/WBS structure, calendars, and activity coding standards for teams standing up or cleaning up their own P6 environment.

HOW IT WORKS

Four steps, one point of contact

No account team, no bench of junior schedulers. You work directly with the person building the schedule, start to finish.

01 · INTAKE

Scope the schedule

Contract documents, RFP requirements, and estimate assumptions reviewed to define schedule basis, milestones, and level of detail.

02 · BUILD

Build in P6

Activities, logic, durations, and calendars developed in Primavera P6 Professional, coded to a consistent activity structure.

03 · REVIEW

Pressure-test it

Critical path, float, and sequencing reviewed against real constructability — not just logic-tied for the sake of a clean network.

04 · DELIVER

Hand it off

Final schedule, narrative, and supporting workbooks delivered in the format your team and your owner expect.

SCHEDULINGPrimavera P6 Professional
ESTIMATING BACKGROUNDBid2Win & Excel
MARKETSHV Transmission · Substation · MV Overhead (Hendrix & Bare Wire) · Renewables
M
PMP Certified Primavera P6 — CPM Scheduling Retired HV Transmission, Substation & MV Overhead Estimator

Daniel Plecki, PMP

Owner & Full-Time Scheduler, McMahon Scheduling Group LLC

Daniel runs McMahon Scheduling Group full-time after retiring as a Lead High-Voltage Estimator, where he spent years pricing large transmission line, substation, and MV overhead projects — including Hendrix spacer cable systems and bare wire construction. That background didn't go away when he moved into scheduling; it's the reason his schedules hold up. He's priced the work before he's sequenced it.

He's completed formal CPM training through Plan Academy's Construction Planning and Scheduling program, and holds a PMP credential. Primavera P6 Professional is his primary scheduling platform, backed by the same Excel-based workbook discipline he built his estimating career on.

McMahon Scheduling Group LLC is a Florida-registered scheduling consultancy built specifically for HV EPC contractors and utility project teams — not a generalist construction scheduling shop that happens to take HV work.

Let's talk about your schedule.

Bid-phase support, a full CPM build, or a second set of eyes on an existing P6 schedule — reach out and we'll figure out where you need help.